Education Building

Start (phase 2): May 2019

End: April 2020

The Education Building’s envelope has severely deteriorated over time due to frequent water infiltration. This project consists of restoring the envelope, starting with repairs or replacement of the roof and the exterior brick walls in 2018, followed with repairs to the building terraces and the electrical room in 2019 (basement), and to the garage in 2021.