Design Standards

These Standards apply to all new construction or renovation projects. They must be followed by all Professionals (Architects, Engineers, lighting consultant, acoustical consultant, etc.) for the preparation of their documents. McGill’s Standards are intended as a general rule for most circumstances and to provide direction to the Design Professionals. The purpose of these Standards is to assure maximum quality and value in construction projects at McGill University, through uniformity, system or component quality, compatibility, functionality, and ease of maintenance. In addition, all construction projects on campus, regardless of scope or scale, will be executed following the sustainable principles of the LEED standard. 

FORMS:

Design Standards Conformity Form and Variance Request Form

 

DIVISION 0 – INSTRUCTIONS TO CONSULTANTS

00 00 01  Table of Contents   - May 2023

00 10 00   Introduction - September 2022

00 20 00   Instructions to Consultants - September 2022

 

DIVISION 1 – GENERAL REQUIREMENTS

01 56 00 Temporary Barriers and Enclosures   - June 2023

01 60 00 PDF icon Product Requirements - Apr 2021

01 74 19 PDF icon Waste Management and Disposal - Apr 2021

01 81 13  Sustainable Design Requirements  - March 2024
01 81 16   Facility Environmental Requirements - March 2024
01 83 16   Exterior Enclosure Performance Requirements  - March 2024 
01 84 19 PDF icon Interior Finishes Performance Requirements - May 2017

01 86 00PDF icon Facility Services Performance Requirements - Oct 2018
01 86 00  File Fiche énergétique - Nov 2017

01 86 01 PDF icon Appareils de Mesurage de l'Énergie (Débitmètres) - Oct 2018

01 86 02 PDF icon Appareils de mesurage en électricité (compteur électrique) - Mar 2021
01 89 00 PDF icon Site Construction Performance Requirements- May 2017

01 91 13 PDF icon General Commissioning Requirements - Mar 2021
01 91 13 PDF icon Tableau sélection mode mise en service - Mar 2021
01 91 13 PDF icon Tableau service à rendre mise en service - Mar 2021

01 91 13 PDF icon Tableau des Prix - Apr 2021

SPECIAL BUILDING AREAS

  1.  Animal Facilities    September 2022
  2. Classrooms, General Jan 2014
  3.  PDF icon Classrooms May 2020
  4.  Corridors and Hallways   September 2023 
  5. Custodial   March 2023 
  6. PDF icon Design of Research Space Jun 2018
  7. PDF icon Electrical Rooms Dec 2017
  8. PDF icon Entrance Vestibules May 2017
  9. Laboratories March 2023 
  10. PDF icon Landscape  - May 2019
  11. PDF icon Mechanical Rooms Dec 2017
  12. PDF icon Offices February 2022
  13.  Roofs  June 2023
  14. Staff rooms Jun 2015
  15. PDF icon Stairs and Ramps September 2022
  16. Telecommunication Data Rooms Jan 2014
  17. Washrooms - July 2023

TECHNICAL STANDARDS
DIVISION 2 – EXISTING CONDITIONS

02 01 01 Tree Preservation - Jul 2013
02 41 16 Selective site demolition -October  2022
02 80 00 Hazardous Materials - Oct 2014
02 82 15 Asbestos remediation - Dec 2017

DIVISION 3 – CONCRETE

03 05 10 PDF icon Concrete - Nov 2017

03 30 00   Béton coulé en place - September 2023

DIVISION 4 – MASONRY

04 05 10 PDF icon Common work for masonry- May 2017

DIVISION 5 – METALS

05 50 00 PDF icon Metal Fabrication - May 2017

DIVISION 6 – WOOD

06 10 10 PDF icon Rough Carpentry - May 2017
06 40 00 PDF icon Architectural Woodwork - May 2017

DIVISION 7 – THERMAL & MOISTURE PROTECTION

07 21 00 PDF icon Thermal Insulation - Apr 2021

07 52 00 PDF icon Roofing - May 2017
07 52 00   Tableau – Îlots de chaleur: Toitures - June 2023
07 81 00 PDF icon Applied Fireproofing - May 2017
07 84 00 PDF icon Fire-stopping - May 2017
07 92 10 PDF icon Joint sealing - May 2017

DIVISION 8 – DOORS AND OPENINGS

08 03 11 PDF icon Historic –Period wood doors - May 2017
08 11 14 PDF icon Metal Doors and Frames - May 2017
08 11 16 PDF icon Aluminum Doors and frames - May 2017
08 14 10 PDF icon Interior Flush wood doors - May 2017
08 33 36 PDF icon Side Folding Grilles - May 2017
08 35 14 PDF icon Accordion Folding Doors - May 2017
08 35 15 PDF icon Acoustic Folding Doors - May 2017
08 50 50    Windows -  June 2022
08 71 10 - Hardware - March 2022

08 80 50 PDF icon Glazing - May 2017

DIVISION 9 – FINISHES

09 21 16 PDF icon Gypsum Board Assemblies - May 2017
09 22 27 PDF icon Suspended Ceiling - Mar 2021

09 30 13   Ceramic Tiling - January 2024 
09 65 16  Resilient Sheet Flooring   - March 2024 
09 65 19 Resilient Tile Flooring   - November 2023
09 68 00  Carpeting - January 2024
09 84 10 PDF icon Acoustic Treatment - Apr 2021
09 91 13 PDF icon Exterior Painting - Sep 2017
09 91 26 PDF icon Painting- May 2017

DIVISION 10 – SPECIALTIES

10 11 00 PDF icon Visual Display Board - May 2017

10 21 20 Toilet Partitions - June 2023

10 28 10  PDF icon Washrooms accessories - Nov 2020

DIVISION 11 – EQUIPMENT

11 53 13 PDF icon Laboratory Fume Hoods - Oct 2018

DIVISION 12 – FURNISHING

12 35 53 PDF icon Laboratory Casework - October 2021

12 35 54 PDF icon Chemical Storage Cabinets - Oct 2018

12 48 20 PDF icon Foot grilles - May 2017
12 50 00 PDF icon Furniture - May 2017
12 50 10  Podiums  Nov 2017
12 51 30  PDF icon Window coverings - June 2020

12 93 23  Trash and Litter Receptacles - June 2023

DIVISION 14 –CONVEYING EQUIPMENT

14 21 23  Elevators March 2023 

DIVISION 21 – FIRE SUPPRESSION

21 07 18 Fire Supression- Calorifugeage - Jan 2014

21 13 00 Sprinkler Systems - Jan 2014
21 13 10 PDF icon Portable fire extinguishers and fire hoses - May 2017

21 13 13  PDF icon Wet pipe sprinkler system - Nov 2020
21 30 00 Fire Pumps - Jan 2014

DIVISION 22 – PLUMBING

22 00 00  Plomberie  -September 2022
22 05 00 Plomberie - Exigences générales concernant les résultats des travaux - September 2022
22 05 29 Plomberie - Fixations Parasismique - Jan 2014
22 07 00 Plomberie - Calorifugeage - September 2022
22 11 18 PDF icon Tuyauterie d'eau domestique - Sep 2016
22 13 17 Plomberie -Tuyauteries d'évacuation et de ventilation - fonte cuivre plastique - September 2022
22 15 00 Plomberie -Réseaux d'air comprimé - Jan 2014

22 42 01  Plomberie - appareils speciaux et traitement de l'eau - September 2022
22 42 02  Plomberie – appareils sanitaires – éviers et cuviers - September 2022

22 42 03  Plomberie - appareils sanitaires - lavabos, w.-c., urinoirs et douches  -September 2022

22 47 00  PDF icon Appareils sanitaires - Fontaines Refroidisseurs d'Eau - April 2019

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING

23 00 00  Heating, Ventilation and Air Conditioning - September 2022

23 05 53 PDF icon Identification des systèmes mécaniques et des dessins  - April 2019

23 05 53 PDF icon Identification des systèmes mécaniques - dessin seulement - April 2019

23 09 33 Entraînement à fréquence variable - February 2024

23 11 23  PDF icon Laboratory piping for gases   - Nov 2020
23 38 17 PDF icon Chemical Fume Hood - April 2019
23 82 23  Unités de ventilation de CVCA - September 2022

DIVISION 25 - AUTOMATISATION INTÉGRÉE

25 00 00 Automation intégrée - November 2023

25 40 00 PDF icon Lignes directrices pour la conception de centrale de refroidissement - Sep 2016

DIVISION 26 – ELECTRICAL

26 00 00   Électricité  - September 2022

26 05 01   Relevés électriques  - Septembre 2022
26 05 01   Relevés électriques STD-E-001 rév. 12 – dessin seulement -Septembre 2023

26 05 01 Relevés électriques formulaire de traçage rév 5 (pdf)   - December 2023 

26 05 01  Relevés électriques formulaire de traçage rév 5 (Word)  - December 2023

26 05 14  Câbles de transport d’énergie (1001V et plus)  - September 2022
26 05 21  Fils et cables/0-1000 V - June 2023 
26 05 28  Mise à la terre - September 2022
26 05 29   Fixation parasismique - September 2022
26 05 31   Armoires et boites de jonction, de triage et de répartition - September 2022
26 05 34   Conduits, fixations et raccords de conduits -  September 2022
26 05 36  Chemin de câbles - September 2022
26 05 81  Moteurs - December 2023
26 09 02 PDF icon Appareils de comptage et appareils de mesure de tableaux de communication -  Jan 2020

26 12 13  Transformateurs à diélectrique liquide moyenne tension - September 2022 

26 12 16_01  Transformateurs sec – primaire jusqu’à 600V - September 2022

26 18 26  Disjoncteurs à moyenne tension - September 2022

26 24 16   Panneaux de distribution - September 2022
26 24 19  Centre de commande de moteurs - September 2022

26 25 00  Barres blindées - September 2022

26 28 16  Disjoncteurs à boitier moulé et sous air - September 2022

26 28 18   Protection contre les fuites à la terre - September 2022
26 28 22   Sectionneurs - September 2022

26 29 10  Démarreurs - September 2022
26 32 13  Groupes électrogènes à moteur diesel - September 2022 
26 50 00  Éclairage - September 2022

26 56 19  Exterior Lighting  - September 2022

DIVISION 27 – COMMUNICATIONS 

27 01 40 Operation and Maintenance of Audio-Video Communications - February 2023

27 06 40 Schedules for Audio-Video Communications - November 2023

27 08 40 Commissioning of Audio-Video Communications November 2023

27 40 00 Audio-Video Communications (General) - February 2023

27 40 01 Scope of Work for Audio-Video Design - February 2023

27 40 02 Scope of Work for Audio-Video Installation - February 2023

27 40 03 Scope of Work for Audio-Video Maintenance and Repairs - February 2023 

27 41 00 Audio -Video System (General) - February 2023

27 41 01 Standard Audio-Video Products - February 2023

27 41 02 Standard Audio-Video Installation Practices - February 2023

27 41 03 Standard Audio-Video Automation System Implementation - February 2023

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 31 01  Fire alarm systems - December 2023

DIVISION 31 - EARTHWORKS

31 05 16 PDF icon Aggregate Materials - Apr 2021

31 11 00PDF icon Clearing and Grubbing - Sep 2017
31 35 00 PDF icon Natural Stone - May 2019

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 00 00 PDF icon Exterior Improvements - Sep 2017
32 00 00 Table/ Ilots de chaleur: surfaces autres que les toitures - Jan 2014
32 01 90.33PDF icon Tree and Shrub Preservation - Sep 2017
32 11 23PDF icon Aggregate Base Courses - Sep 2017
32 12 16PDF icon Asphalt Paving - Sep 2017
32 14 15   Prefabricated Unit Paving - November 2022

32 15 40 PDF icon Crushed Stone and Screening Surfaces - Apr 2021

32 31 00  PDF icon Fences and Gates    - February 2022
32 37 00  PDF icon Exterior Site Furnishings   - July 2021

32 37 50PDF icon Exterior Lighting - Sep 2017

32 50 00 Green Roofs - June 2023
32 91 19.13 PDF icon Topsoil Placement and Grading - Apr 2021

32 92 19 PDF icon Seeding  - May 2019
32 92 23 PDF icon Sodding - Apr 2021
32 93 10 PDF icon Trees, Shrubs and Ground Cover Planting - Apr 2021
32 93 15 PDF icon Hydraulic Transplanting - May 2019
32 93 43.01PDF icon Tree Pruning - Sep 2017

DIVISION 33 – SITE UTILITIES

33 40 00  PDF icon Rainwater Management - Jan 2020