These Standards apply to all new construction or renovation projects. They must be followed by all Professionals (Architects, Engineers, lighting consultant, acoustical consultant, etc.) for the preparation of their documents. McGill’s Standards are intended as a general rule for most circumstances and to provide direction to the Design Professionals. The purpose of these Standards is to assure maximum quality and value in construction projects at McGill University, through uniformity, system or component quality, compatibility, functionality, and ease of maintenance. In addition, all construction projects on campus, regardless of scope or scale, will be executed following the sustainable principles of the LEED standard.
FORMS:
Design Standards Conformity Form and Variance Request Form
DIVISION 0 – INSTRUCTIONS TO CONSULTANTS
00 00 01 Table of Contents - May 2023
00 10 00 Introduction - September 2022
00 20 00 Instructions to Consultants - September 2022
DIVISION 1 – GENERAL REQUIREMENTS
01 56 00 Temporary Barriers and Enclosures - June 2023
01 60 00 Product Requirements - Apr 2021
01 74 19 Waste Management and Disposal - Apr 2021
01 81 13 Sustainable Design Requirements - March 2024
01 81 16 Facility Environmental Requirements - March 2024
01 83 16 Exterior Enclosure Performance Requirements - March 2024
01 84 19 Interior Finishes Performance Requirements - May 2017
01 86 00 Facility Services Performance Requirements - Oct 2018
01 86 00 Fiche énergétique - Nov 2017
01 86 01 Appareils de Mesurage de l'Énergie (Débitmètres) - Oct 2018
01 86 02 Appareils de mesurage en électricité (compteur électrique) - Mar 2021
01 89 00 Site Construction Performance Requirements- May 2017
01 91 13 General Commissioning Requirements - Mar 2021
01 91 13 Tableau sélection mode mise en service - Mar 2021
01 91 13 Tableau service à rendre mise en service - Mar 2021
01 91 13 Tableau des Prix - Apr 2021
SPECIAL BUILDING AREAS
- Animal Facilities September 2022
- Classrooms, General Jan 2014
- Classrooms May 2020
- Corridors and Hallways September 2023
- Custodial March 2023
- Design of Research Space Jun 2018
- Electrical Rooms Dec 2017
- Entrance Vestibules May 2017
- Laboratories March 2023
- Landscape - May 2019
- Mechanical Rooms Dec 2017
- Offices February 2022
- Roofs June 2023
- Staff rooms Jun 2015
- Stairs and Ramps September 2022
- Telecommunication Data Rooms Jan 2014
- Washrooms - July 2023
TECHNICAL STANDARDS
DIVISION 2 – EXISTING CONDITIONS
02 01 01 Tree Preservation - Jul 2013
02 41 16 Selective site demolition -October 2022
02 80 00 Hazardous Materials - Oct 2014
02 82 15 Asbestos remediation - Dec 2017
DIVISION 3 – CONCRETE
03 05 10 Concrete - Nov 2017
03 30 00 Béton coulé en place - September 2023
DIVISION 4 – MASONRY
04 05 10 Common work for masonry- May 2017
DIVISION 5 – METALS
05 50 00 Metal Fabrication - May 2017
DIVISION 6 – WOOD
06 10 10 Rough Carpentry - May 2017
06 40 00 Architectural Woodwork - May 2017
DIVISION 7 – THERMAL & MOISTURE PROTECTION
07 21 00 Thermal Insulation - Apr 2021
07 52 00 Roofing - May 2017
07 52 00 Tableau – Îlots de chaleur: Toitures - June 2023
07 81 00 Applied Fireproofing - May 2017
07 84 00 Fire-stopping - May 2017
07 92 10 Joint sealing - May 2017
DIVISION 8 – DOORS AND OPENINGS
08 03 11 Historic –Period wood doors - May 2017
08 11 14 Metal Doors and Frames - May 2017
08 11 16 Aluminum Doors and frames - May 2017
08 14 10 Interior Flush wood doors - May 2017
08 33 36 Side Folding Grilles - May 2017
08 35 14 Accordion Folding Doors - May 2017
08 35 15 Acoustic Folding Doors - May 2017
08 50 50 Windows - June 2022
08 71 10 - Hardware - March 2022
08 80 50 Glazing - May 2017
DIVISION 9 – FINISHES
09 21 16 Gypsum Board Assemblies - May 2017
09 22 27 Suspended Ceiling - Mar 2021
09 30 13 Ceramic Tiling - January 2024
09 65 16 Resilient Sheet Flooring - March 2024
09 65 19 Resilient Tile Flooring - November 2023
09 68 00 Carpeting - January 2024
09 84 10 Acoustic Treatment - Apr 2021
09 91 13 Exterior Painting - Sep 2017
09 91 26 Painting- May 2017
DIVISION 10 – SPECIALTIES
10 11 00 Visual Display Board - May 2017
10 21 20 Toilet Partitions - June 2023
10 28 10 Washrooms accessories - Nov 2020
DIVISION 11 – EQUIPMENT
11 53 13 Laboratory Fume Hoods - Oct 2018
DIVISION 12 – FURNISHING
12 35 53 Laboratory Casework - October 2021
12 35 54 Chemical Storage Cabinets - Oct 2018
12 48 20 Foot grilles - May 2017
12 50 00 Furniture - May 2017
12 50 10 Podiums Nov 2017
12 51 30 Window coverings - June 2020
12 93 23 Trash and Litter Receptacles - June 2023
DIVISION 14 –CONVEYING EQUIPMENT
14 21 23 Elevators March 2023
DIVISION 21 – FIRE SUPPRESSION
21 07 18 Fire Supression- Calorifugeage - Jan 2014
21 13 00 Sprinkler Systems - Jan 2014
21 13 10 Portable fire extinguishers and fire hoses - May 2017
21 13 13 Wet pipe sprinkler system - Nov 2020
21 30 00 Fire Pumps - Jan 2014
DIVISION 22 – PLUMBING
22 00 00 Plomberie -September 2022
22 05 00 Plomberie - Exigences générales concernant les résultats des travaux - September 2022
22 05 29 Plomberie - Fixations Parasismique - Jan 2014
22 07 00 Plomberie - Calorifugeage - September 2022
22 11 18 Tuyauterie d'eau domestique - Sep 2016
22 13 17 Plomberie -Tuyauteries d'évacuation et de ventilation - fonte cuivre plastique - September 2022
22 15 00 Plomberie -Réseaux d'air comprimé - Jan 2014
22 42 01 Plomberie - appareils speciaux et traitement de l'eau - September 2022
22 42 02 Plomberie – appareils sanitaires – éviers et cuviers - September 2022
22 42 03 Plomberie - appareils sanitaires - lavabos, w.-c., urinoirs et douches -September 2022
22 47 00 Appareils sanitaires - Fontaines Refroidisseurs d'Eau - April 2019
DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING
23 00 00 Heating, Ventilation and Air Conditioning - September 2022
23 05 53 Identification des systèmes mécaniques et des dessins - April 2019
23 05 53 Identification des systèmes mécaniques - dessin seulement - April 2019
23 09 33 Entraînement à fréquence variable - February 2024
23 11 23 Laboratory piping for gases - Nov 2020
23 38 17 Chemical Fume Hood - April 2019
23 82 23 Unités de ventilation de CVCA - September 2022
DIVISION 25 - AUTOMATISATION INTÉGRÉE
25 00 00 Automation intégrée - November 2023
25 40 00 Lignes directrices pour la conception de centrale de refroidissement - Sep 2016
DIVISION 26 – ELECTRICAL
26 00 00 Électricité - September 2022
26 05 01 Relevés électriques - Septembre 2022
26 05 01 Relevés électriques STD-E-001 rév. 12 – dessin seulement -Septembre 2023
26 05 01 Relevés électriques formulaire de traçage rév 5 (pdf) - December 2023
26 05 01 Relevés électriques formulaire de traçage rév 5 (Word) - December 2023
26 05 14 Câbles de transport d’énergie (1001V et plus) - September 2022
26 05 21 Fils et cables/0-1000 V - June 2023
26 05 28 Mise à la terre - September 2022
26 05 29 Fixation parasismique - September 2022
26 05 31 Armoires et boites de jonction, de triage et de répartition - September 2022
26 05 34 Conduits, fixations et raccords de conduits - September 2022
26 05 36 Chemin de câbles - September 2022
26 05 81 Moteurs - December 2023
26 09 02 Appareils de comptage et appareils de mesure de tableaux de communication - Jan 2020
26 12 13 Transformateurs à diélectrique liquide moyenne tension - September 2022
26 12 16_01 Transformateurs sec – primaire jusqu’à 600V - September 2022
26 18 26 Disjoncteurs à moyenne tension - September 2022
26 24 16 Panneaux de distribution - September 2022
26 24 19 Centre de commande de moteurs - September 2022
26 25 00 Barres blindées - September 2022
26 28 16 Disjoncteurs à boitier moulé et sous air - September 2022
26 28 18 Protection contre les fuites à la terre - September 2022
26 28 22 Sectionneurs - September 2022
26 29 10 Démarreurs - September 2022
26 32 13 Groupes électrogènes à moteur diesel - September 2022
26 50 00 Éclairage - September 2022
26 56 19 Exterior Lighting - September 2022
DIVISION 27 – COMMUNICATIONS
27 01 40 Operation and Maintenance of Audio-Video Communications - February 2023
27 06 40 Schedules for Audio-Video Communications - November 2023
27 08 40 Commissioning of Audio-Video Communications November 2023
27 40 00 Audio-Video Communications (General) - February 2023
27 40 01 Scope of Work for Audio-Video Design - February 2023
27 40 02 Scope of Work for Audio-Video Installation - February 2023
27 40 03 Scope of Work for Audio-Video Maintenance and Repairs - February 2023
27 41 00 Audio -Video System (General) - February 2023
27 41 01 Standard Audio-Video Products - February 2023
27 41 02 Standard Audio-Video Installation Practices - February 2023
27 41 03 Standard Audio-Video Automation System Implementation - February 2023
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 31 01 Fire alarm systems - December 2023
DIVISION 31 - EARTHWORKS
31 05 16 Aggregate Materials - Apr 2021
31 11 00 Clearing and Grubbing - Sep 2017
31 35 00 Natural Stone - May 2019
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 00 00 Exterior Improvements - Sep 2017
32 00 00 Table/ Ilots de chaleur: surfaces autres que les toitures - Jan 2014
32 01 90.33 Tree and Shrub Preservation - Sep 2017
32 11 23 Aggregate Base Courses - Sep 2017
32 12 16 Asphalt Paving - Sep 2017
32 14 15 Prefabricated Unit Paving - November 2022
32 15 40 Crushed Stone and Screening Surfaces - Apr 2021
32 31 00 Fences and Gates - February 2022
32 37 00 Exterior Site Furnishings - July 2021
32 37 50 Exterior Lighting - Sep 2017
32 50 00 Green Roofs - June 2023
32 91 19.13 Topsoil Placement and Grading - Apr 2021
32 92 19 Seeding - May 2019
32 92 23 Sodding - Apr 2021
32 93 10 Trees, Shrubs and Ground Cover Planting - Apr 2021
32 93 15 Hydraulic Transplanting - May 2019
32 93 43.01 Tree Pruning - Sep 2017
DIVISION 33 – SITE UTILITIES
33 40 00 Rainwater Management - Jan 2020