McGill University has mandated Construction Bralteck to carry out Project 21-081 Strathcona Anatomy and Dentistry – CFI Ortega, which involves the fit-up of rooms B/31, B/32B, B/27, and B/2F within the Facility for Electron Microscopy Research (FEMR), to accommodate two new microscopes.


McGill University has mandated SDI Canada to carry out Project 21-094, which involves the installation of a new 9.4T MRI in the Webster Pavilion of the Montreal Neurological Institute.
The project will renovate and transform laboratory spaces WB306 and its adjacent rooms WB305 and WB307 to house the new MRI. A new HVAC system will also be installed on the Webster roof to provide cooling, heating, and humidification. Once complete, the facility will expand McGill’s research capacity in neuroscience and imaging.

Please be advised that McGill University has mandated CORENOV CONSTRUCTEURS INC. under the supervision of REDBOURNE to carry out the following project: 24-040 SIM Center – Medicine Cohort increase.
Description: The project includes creation of a satellite facility in leased space, transformation of existing space, and the use of technology for multi-space connectivity.
Construction start date: August 4th, 2025
Planned construction end date: End of December 2025

Please be advised that McGill University has mandated CORENOV CONSTRUCTEURS INC. to carry out the following project: 21-053 Rutherford Physics - CFI IF 2023 Childress, Renovation of Room 419
Description: Room 419 is already an existing research laboratory. It has two smaller rooms inside of it but the walls will be demolished to create one large room. The room will be updated to meet the McGill Design Standards for a research laboratory and it will be reconfigured to meet laser lab requirements as well.
Please be advised that McGill University has mandated general contractor SUTERA INC. to carry out the following project: 20-069 Trottier Space Institute extension.

Please be advised that McGill University has mandated Corenov Construction to carry out the following project: 21-089 – CFI IF Tufenkji – Macdonald Stewart (Macdonald Campus).
Description: Partial renovation of laboratory MS3-025.
Construction start date: June 9th, 2025
Planned construction end date: July, 2025
Work schedule: Monday to Friday, 6 a.m. to 3 p.m.
Project Manager: mark.ouimet [at] mcgill.ca (Mark Ouimet)

Please be advised that McGill University has mandated Concept P.V.R. to carry out the following project: 21-028 - Lyman Duff - CFI Ernst
Description: Renovation of existing laboratories on the 6th and 7th floors to support Dr. Ernst’s research and CFI equipment.
Construction start date: June 5th 2025
Planned construction end date: June 30th 2026
Work schedule: Monday to Friday, 7am to 9pm. Works outside of building hours will be coordinated in advance.

Please be advised that McGill University has mandated CORENOV Contractors to carry out the work associated with the project hereafter: 22-013 Wong - CFI JELF Oct 2022, Huberman - Lab 5270
Description: To construct a laser enclosure in Laboratory 5270 and integrate its services with the building’s existing infrastructure.
Construction start date: May 14, 2025
Planned construction end date: July 04, 2025
Work schedule: Monday to Friday, 7 a.m. to 3 p.m.

Please be advised that McGill University has mandated St-Denis Thompson Inc to carry out the following project: 18-103 New Residence Hall - Restoration of Facades – PHASE 2
Description: Complete replacement of block facing on building facades and repair of concrete surfaces.
Construction start date: May 5, 2025
Planned construction end date: End of 2026
Work schedule:

Please be advised that McGill University has mandated CORENOV CONSTRUCTEURS to carry out the following project: 23-027 Duff, CFI IF 2023, Siegel
Description: Renovation of lab 615 including replacement of ceiling tiles, repairs to floors/walls, installation of new lab bench and sink
Construction start date: April 28, 2025
Planned construction end date: End of May 2025
Work schedule: Monday to Friday, 7 a.m. to 3 p.m.

Please be advised that, following a winter break, construction work will resume with Ceveco Inc. to carry out the following project: 19-016 Reconstruction of Upper Main Road, Downtown Campus.
Description: Reconstruction of the Upper Main Road, from the Y intersection to the McCall MacBain Arts Building, including underground work.
Construction restart date: March 31, 2025
Planned construction end date: November 2025
Work schedule: Monday to Friday, 6 a.m. to 7 p.m. / Saturday, 6 a.m. to 7 p.m.

Please be advised that McGill University has mandated J.L Prist to carry out the following project: 23-034 - Wong CFI IF 2023 Brochure
Description: Renovation of rooms 2240, 2241, mainly around electrical and mechanical systems.
Construction start date: March17, 2025
Planned construction end date: July 18, 2025
Work schedule: Monday to Friday, 7:00 a.m. to 3 p.m. Works outside of building hours will be coordinated in advance.

Please be advised that McGill University has mandated Atwill-Morin Maçonnerie (Groupe Atwill-Morin Inc.) to carry out the following project: 22-035 (B159) Lot 3 - Corrective masonry work on the corner of the staircase wall (MNI Rockefeller Wing)
Description: The purpose of the work is to make the structural and masonry fixes required at the corner of the staircase wall of the Rockefeller wing of the Montreal Neurology Institute for safety purposes. The Rockefeller wing was built in 1934 and is located on University Street in Montreal.

Please be advised that McGill University has mandated Plomberie Charbonneau to carry out the following project: 23-012 - Currie Gym - Replacement of the multistack chiller
Description: Installation of a new main chiller and its integration into the building control system.
Construction start date: February 17, 2025
Planned construction end date: May 30, 2025
Work schedule: Monday to Friday, 6:30 a.m. to 3 p.m. Works outside of building hours will be coordinated in advance.

Please be advised that McGill University has mandated CORENOV CONSTRUCTEURS to carry out the following project: 21-007 Parasitology Building – JELF Lu and Liu
Description: Renovation of lab P039 on the first floor of the Parasitology Building.
Construction start date: March 3rd, 2025
Planned construction end date: March 28th, 2025
Work schedule: Monday to Friday 6 a.m. to 3 p.m. Any additional hours will be coordinated.