From Saturday, Oct. 5 through Tuesday, Oct. 8, the Downtown and Macdonald Campuses will be open only to McGill students, employees and essential visitors. Many classes will be held online. Remote work required where possible. See Campus Public Safety website for details.
Du samedi 5 octobre au mardi 8 octobre, le campus du centre-ville et le campus Macdonald ne seront accessibles qu’aux étudiants et aux membres du personnel de l’Université McGill, ainsi qu’aux visiteurs essentiels. De nombreux cours auront lieu en ligne. Le personnel devra travailler à distance, si possible. Voir le site Web de la Direction de la protection et de la prévention pour plus de détails.
The Ernest Rutherford Physics Building, named after one of McGill's most famous radiation physicists, was constructed in 1977 to provide this department with modern labs and equipment. The...
The small animal research unit (SARU), with a housing system for rodent animal models, guinea pigs, neonatal pigs and rabbits, is a Faculty facility that provides resources for small-animal models...
The Macdonald Engineering Building is the proud first home of the Faculty of Engineering at McGill University. Originally built in 1893, this historic structure was a generous gift from Sir William...
Thomson House, formerly known as Maison Charles-Édouard Gravel (Gravel House), was built in 1934 by architects Jean-Julien Perrault and Joseph-Roméo Gadbois[1].
On October 4th, 2021, McGill University launched an innovative initiative by occupying the Pilot Project workspace. This dynamic space embodies an open, shared, and collaborative model, serving as...
Built in 1939, War Memorial, Currie Gymnasium this remarkable addition to the McGill Sports Complex was named in honor of Sir Arthur Currie, who served as McGill’s principal from 1920 to 1933.