Renovation of The Old Chancellor Day Hall Basement

1 May 2024

James Ross was a Canadian businessman, art collector and builder, who oversaw the construction of the Canadian Pacific Railway across Canada....

Pine 1140, Priority Building Envelop Repairs Project

1 May 2024

This three-storey institutional building (originally a private residence), with two basements, was designed in the Edwardian style and built around 1902. Architects Edward and William Sutherland...

Administrative Office Furniture - Design Services #101

1 May 2024

Design Services establishes design and construction standards and ensures that McGill’s facilities provide an environment that is aesthetically pleasing, sustainable, and conducive to the learning...

McIntyre Building, Priority Building Envelop Repairs

1 May 2024

Completed in 1962 after plans prepared by Marshall and Merrett Architects, the McIntyre Building houses McGill University’s Faculty of Medicine.  An iconic circular tower and a fixture of the...

Renovation of the Engineering Peer Tutoring Services (EPTS) Space - Adams Building

1 May 2024

The Frank Dawson Adams Building is a four-storey institutional building in the International Style that was designed by McDougall, Fleming and Smith, and completed in 1951. ...

680 Sherbrooke, Ground Floor - School of Continuing Studies

1 May 2024

680 Sherbrooke was originally designed as an office building with some commercial spaces on the two lower levels. Its construction was completed in 1976. Since 1999, McGill University has been a co...

Macdonald Campus, Bike Shelter with Sustainable Materials, Pilot Project

1 May 2024

The McGill University Climate & Sustainability Strategy 2020-2025 sets the framework to achieve meaningful changes on our campuses in the next five years. Building off the success of previous...