Get Help !

Supply of Natural Gas

26 Jun 2024

McGill University is actively addressing its greenhouse gas (GHG) emissions challenge, primarily driven by building energy consumption, notably natural gas for heating across its campuses....

McConnell Engineering, Replacement Of Heating Coils

1 May 2024

The McConnell Engineering Building was donated to McGill in 1959 by John W. McConnell, a major benefactor of the University since 1911 and one of its Governors from 1928 until 1958. In the period...

McCall-MacBain Arts Building & Dawson Hall - Roof Basins Upgrade

1 May 2024

The elegant and Classical-style composition of McGill’s iconic Arts Building is the result of 80 years of construction, renovation and additions. The central pavilion (the original Arts Building)...

Sherbrooke 680, School Of Physical And Occupational Therapy (SPOT) Relocation

1 May 2024

In 1999, the University purchased in co-ownership from the Industrielle Alliance insurance company a 50-per-cent share of the building. That space consisted of the 12 floors accessible through a...

Pine 1140, Priority Building Envelop Repairs Project

1 May 2024

This three-storey institutional building (originally a private residence), with two basements, was designed in the Edwardian style and built around 1902. Architects Edward and William Sutherland...

3465 Durocher, Reconstruction / Replacement of Masonry Facade

1 May 2024

Durocher 3465, a historic building constructed in 1921, became part of McGill University's estate in 2006.

Pages

Back to top